 
                            
                                            Add to Cart
Mesh belt-type shot blasting machine/Sand blast Equipment is mainly used for thin-walled castings, thin-walled and fragile iron or aluminum alloy castings, ceramic and other small parts surface shot blasting.Mesh belt-type shot blasting machine can also be used for mechanical parts shot blasting and strengthen. with a small continuity, high cleaning efficiency, deformation is small, no pit and other characteristics;It can be used alone, also can use more than one combination.
| Mesh Through Type Shot Blasting Machine Technology Data | |||
| Model | MND-1040P11-4 | ||
| MND-1040P11-4E | MND-1040P11-4H | ||
| NO. | Technology Data | Economical | High Quality | 
| 1 | Application | Auto Stabilizer Bar/Aluminium Casting/Irregular Part etc. | |
| 2 | Machine Size:L*W*H | 8000mm*4000mm*5500mm | |
| 3 | Parts Size: L*W*H | 2500mm*1000mm*400mm | |
| 4 | Loading Weight of 1 Roller | 200kgs | |
| 5 | Produce Speed(Batch/min) | 8—10 | 5—8 | 
| 6 | Dust Emision(mg/m³) | ≤50 | ≤30 | 
| 7 | Noise(db) | ≤85 | ≤80 | 
| 8 | Total Power(kw) | 76 | 83.5 | 
| 9 | Air Loss(m³/min) | 0.5 | |
| NO. | Configuration | Economical | High Quality | 
| 1 | Full Manganese Steel Shot Blasting Room | Yes | Yes | 
| 2 | Steel Shot Automatic Recycle System Fault Detection Alarm | ||
| 3 | Chain Wire Mesh +Roller Transportation | No | |
| 4 | DC-12 Cartridge Filter | ||
| 5 | MWDC-100 Wet Dust Collector | No | Yes | 
| 6 | Q034-11kw Impeller Head | Yes | No | 
| 7 | P11 Impeller Head | No | Yes | 
| 8 | Stepless Speed Change Loading and Unloading System | Yes | |
| 9 | Steel Shot Flow Semi-Automatic Control System | No | |
| 10 | Steel Shot Flow Automatic Control System | No | Yes | 
| 11 | Impeller Head Frequency Converter Control | ||
| 12 | Electrical Cabinet Air Condition | ||
| 13 | Tooling Customization | For choosing | |
| 14 | Storage Silo Alarm System | No | Yes | 
| 15 | Maintenance Tool (1 Set) | Yes | |
| 16 | Spare Parts | For choosing | |


1. Installation and commissioning issue: We will send 1-2 technicians to assist with machine installation and commissioning, customer pays for their tickets, hotel and diet, etc Customer need arrange 3-4 skilled worker and prepare insallation machinery and tools.
2. Warranty time: 12 months from date of commissioning completion, but no more than 18 months from date of delivery.
3. Supply full English documents: including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.
